JBT Waste of Bedlington chooses JCC Engcon Group to renovate & refurbish an existing heavy
duty picking station.
The contract involved the stripping down, re-fabrication & replacement of all the working parts of
the existing system to prepare for the re-use as a heavy recycling line.
JBT Waste also took the JCC mobile hooklift recycling system on hire as a temporary relief
system to their existing operations.